انتقل إلى معلومات المنتج
1 ل 5

BookTreasures

PRODUCTION OPERATIONS: Well Completions, Workover, and Stimulation

PRODUCTION OPERATIONS: Well Completions, Workover, and Stimulation

السعر العادي LE 720.00 EGP
السعر العادي LE 1,800.00 EGP سعر البيع LE 720.00 EGP
خصم نفذ
يتم احتساب الشحن عند الخروج.
كمية

Production Operations: Well Completions, Workover, and Stimulation is a two-volume set by Thomas O. Allen and Alan P. Roberts, published in 1978. It's a foundational technical manual for professionals and students in the oil and gas industry.

 

Summary

 

The two volumes serve as a comprehensive guide to the engineering practices involved in the production phase of an oil or gas well. They cover the essential processes required to bring a well online and maintain its productivity over time.

  • Well Completions: The procedures for making a well ready for production, including casing, cementing, and installing production tubing.

  • Workover: Operations performed on a well to maintain or increase its production.

  • Stimulation: Techniques used to enhance the flow of oil or gas, such as hydraulic fracturing and acidizing.

The book is notable for its practical, hands-on approach and has been a standard reference for many years in the petroleum engineering field.

 

About the Authors

 

  • Thomas O. Allen was a petroleum engineer and author. He worked extensively in the oil and gas industry, and his expertise in production operations formed the basis of this and other technical publications.

  • Alan P. Roberts was also a petroleum engineer and co-authored the book with Allen, contributing his experience and knowledge to create a comprehensive industry resource.

Language: English

Categories: Technology & Engineering, Reference

Authors: Thomas O. Allen, Alan P. Roberts

Publisher: PetroSkills

Page count: 286 pages

عرض التفاصيل الكاملة

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)